Skip to content
MJS.Construction

12.8999° N 77.5899° E — Konanakunte, Bengaluru

Building & civil contractors · South Bengaluru

Built to the drawing. Priced to the line.

We build houses, retail blocks and RCC structures across JP Nagar, Konanakunte and South Bangalore — on an itemised bill of quantities, six stage payments tied to completed work, and a weekly site report you can hold us to.

Contract
Fixed itemised BOQ
Payments
6 stages, work-linked
Reporting
Weekly photo + spend
Scope
Structure to handover
  • Itemised BOQ before you sign
  • M20 / M25 design mix, cube tested
  • Fe 550D TMT with mill certificates
  • 14-day curing log per slab
  • Weekly photo + spend report
  • Six work-linked stage payments
  • Snag list closed before handover
The build sequence(01)

Six stages. Each one paid for only after you can stand in front of it.

Most disputes on a building site come from not knowing what happens next, or what it costs. This is the whole sequence, in order, with the checks we run and the payment that follows.

SETTING OUTM20 PCC · ISOLATED FOOTINGSM25 SLABS · 14-DAY CURINGPRESSURE TESTED · TERRACE PONDEDSNAGGED · SIGNED OFF · HANDED OVER
STAGE 01Week 1 – 2
Stage
01 / 06
On site
wk 1 – 2
Released by now
10%

Build sequence stages

01

Survey & setting out

Week 1 – 2 · 10% on mobilisation

Boundaries verified against the sale deed, soil bearing capacity established, and the building corners pegged out on the ground so you can walk the footprint before anything is dug.

  • Soil bearing test report
  • Setback check against sanctioned plan
  • Benchmark level fixed on site
02

Foundation & plinth

Week 3 – 7 · 20% on plinth

Excavation to hard strata, PCC bed, isolated footings tied to the bar bending schedule, then columns raised to plinth level and the plinth beam cast to lock the frame together.

  • Anti-termite treatment record
  • Cover blocks and rebar spacing verified
  • M20 cube samples cast and logged
03

RCC frame & slabs

Week 8 – 18 · 30% across slabs

Floor by floor: columns, shuttering, beam and slab reinforcement, one continuous pour per slab, then a fourteen-day curing regime that is logged rather than assumed.

  • Pre-pour rebar inspection with the engineer
  • Slump test at every pour
  • Curing log signed daily for 14 days
04

Masonry & plaster

Week 16 – 26 · 15% on brickwork

Blockwork raised in lifts with lintels and sills cast in place, chases cut before plaster rather than after, and external plaster taken up in one working face to avoid joint lines.

  • Wall plumb and diagonal check per room
  • Lintel bearing verified
  • Plaster thickness gauged, not eyeballed
05

Services & waterproofing

Week 24 – 32 · 15% on services

Concealed electrical conduit, CPVC and drainage lines pressure-tested before they disappear, sunk slabs and terraces waterproofed and ponded, and every route photographed for your records.

  • 24-hour plumbing pressure test
  • Terrace ponding test, 48 hours
  • As-laid conduit photos before plaster closes
06

Finishes & handover

Week 30 – 42 · 10% on handover

Flooring, joinery, painting and fixtures in a sequence that keeps finished surfaces protected, then a written snag list closed out room by room before keys change hands.

  • Room-by-room snag list, signed off
  • All warranties and bills handed over
  • Completion drawings and service routes issued

What we build

What we build(02)

Six ways we work, from bare site to snag list.

Take the whole build or any part of it. The contract changes; the site discipline does not.

Indicative pricing(03)

What a build like yours usually costs.

Move the slider to your built-up area and pick a specification. This is the range we would expect before seeing your drawings — the number that matters comes from an itemised BOQ.

Cost and timeline estimator

Built-up area2,400sq ft
8006,000 sq ft
Specification

Included in standard turnkey

  • Everything in structure only
  • Concealed electrical and plumbing
  • Vitrified flooring, standard sanitaryware
  • Painting, doors, windows, grills

Indicative range

₹44.4 L ₹49.2 L

79 months on site · standard turnkey

How it would be paid

  • 01Survey & setting out₹4.7 L
  • 02Foundation & plinth₹9.4 L
  • 03RCC frame & slabs₹14.0 L
  • 04Masonry & plaster₹7.0 L
  • 05Services & waterproofing₹7.0 L
  • 06Finishes & handover₹4.7 L

Indicative only. Soil condition, number of floors, approvals and your specification all move this number — we price the real one line by line against your drawings.

Recent projects

Recent work(04)

Buildings you can go and stand in front of.

Every project below lists what it was, how long it took and what made it difficult — the parts a photograph on its own will not tell you.

Why owners choose MJS

How we work(05)

High budgets deserve paperwork, not promises.

A construction contract is the largest cheque most families ever write. These four habits are what make ours easy to sign.

Reinforcement being tied and cut to the bar bending schedule on site

Rebar cut to the bar bending schedule · pre-pour inspection

  1. 01

    One itemised BOQ

    Priced line by line before you sign, with brand and grade named for every material. Variations are quoted in writing before the work starts.

  2. 02

    Payments tied to milestones

    Six stage payments, each released against completed work you can stand in front of — never against a calendar date.

  3. 03

    Weekly report on WhatsApp

    Photographs, what moved this week, what is next, and where the spend sits. Owners abroad run entire builds off this report.

  4. 04

    The same engineer throughout

    The person who sets out your foundation is the person who closes your snag list. No handover between teams mid-project.

What clients say

Client feedback(06)

Ask the last three people we built for.

We will give you their numbers. A contractor who will not put you in touch with recent clients is telling you something.

  • They gave us a printed BOQ before we signed and stuck to it. The two changes we asked for mid-build were quoted in writing before anyone lifted a tool.

    Client name

    G+2 residence, Konanakunte

  • I was in Dubai for the entire build. The weekly photo report was detailed enough that nothing at handover surprised me.

    Client name

    Rental block, Uttarahalli

  • Our tenants had signed before the foundation went in. The block was handed over on the date we had committed to them.

    Client name

    Retail block, JP Nagar

Frequently asked questions

Before you call(07)

The six questions every owner asks first.

Straight answers, including the ones about money.

Next step

Send us your plot size and drawings. You will have a BOQ within the week.

Call the site office
+91 00000 00000
Where we are
Konanakunte, Bengaluru
WhatsApp us